高清无码专区在线播放_四虎影视久久久免费观看_免费A级不卡毛片观看_久久无码人妻自慰15P

中文
Projects
Testing Project of the East-West Expressway in Algeria

The East-West Expressway in Algeria is 1216 kilometers long with six lanes in both directions and is the main traffic artery running through the east-west direction of Algeria. 


Back

Main work undertaken

JSTI conducted testing technical consulting, data control, and inspection and measurement for the entire engineering project by establishing and operating the central laboratory of the general contractor, improving the overall quality control level.


Achievements

Won the 15th China Civil Engineering Zhan Tianyou Award.